| Last additions - Workdays and Workgroups |

Shredding Work Day234 viewsSecond Shredding Work Day since shutdown. Practicing as much physical distancing as possible. (Photo Credit: James Redmond)Jun 28, 2020
|
|

Shredding Work Day230 viewsSecond Shredding Work Day since Shutdown. Practicing physical distance as much as possible. (Photo Credit: James Redmond)Jun 28, 2020
|
|

Shredding with COVID rules219 viewsThis was the second Shredding Work Day since the shutdown. Using as much physical distance as possible. (Photo Credit: James Redmond)Jun 28, 2020
|
|

OVF Sign Reinstallation 5/14/2011607 viewsInstallation crew (Photo Credit: Ed Mosman 5/14/2011)May 24, 2011
|
|

OVF Sign Reinstallation 5/14/2011565 viewsThe other end of the brace was bolted to a steel post driven into the ground. (Photo Credit: D. Cleverdon taken 5/14/2011)May 24, 2011
|
|

OVF Sign Reinstallation 5/14/2011580 viewsBraces are needed due to the ocean and desert winds. 4x4 braces were attached using 5/8" all-thread bolts. (Photo Credit: D. Cleverdon taken 5/14/2011)May 24, 2011
|
|

OVF Sign Reinstallation 5/14/2011548 viewsSteel brackets inbedded in concrete pedestals with 5/8" bolts were used to secure the bottoms of the posts. (Photo Credit: D. Cleverdon taken 5/14/2011)May 24, 2011
|
|

OVF Sign Reinstallation 5/14/2011583 viewsOVF sign with new reinforcements.
Concrete bases with steel brackets and 4x4 braces. 5/8" galvanized bolts were used throughout. (Photo Credit: D. Cleverdon taken 5/14/2011)May 24, 2011
|
|

OVF Workday646 viewsSigning in for a Saturday workday (Photo Credit: D. Cleverdon 11/14/2009 )Nov 16, 2009
|
|

Pulling wires601 viewsFrank and Ed begin feeding the wires for the electrical installation at OVF (Photo Credit: Frank Harris)Nov 16, 2009
|
|
|
|
|
|