|
Pulling wires471 viewsFrank and Ed begin feeding the wires for the electrical installation at OVF (Photo Credit: Frank Harris)
|
|
OVF Workday501 viewsSigning in for a Saturday workday (Photo Credit: D. Cleverdon 11/14/2009 )
|
|
OVF Sign Reinstallation 5/14/2011446 viewsOVF sign with new reinforcements.
Concrete bases with steel brackets and 4x4 braces. 5/8" galvanized bolts were used throughout. (Photo Credit: D. Cleverdon taken 5/14/2011)
|
|
OVF Sign Reinstallation 5/14/2011418 viewsSteel brackets inbedded in concrete pedestals with 5/8" bolts were used to secure the bottoms of the posts. (Photo Credit: D. Cleverdon taken 5/14/2011)
|
|
OVF Sign Reinstallation 5/14/2011450 viewsBraces are needed due to the ocean and desert winds. 4x4 braces were attached using 5/8" all-thread bolts. (Photo Credit: D. Cleverdon taken 5/14/2011)
|
|
OVF Sign Reinstallation 5/14/2011432 viewsThe other end of the brace was bolted to a steel post driven into the ground. (Photo Credit: D. Cleverdon taken 5/14/2011)
|
|
OVF Sign Reinstallation 5/14/2011466 viewsInstallation crew (Photo Credit: Ed Mosman 5/14/2011)
|
|
Shredding with COVID rules110 viewsThis was the second Shredding Work Day since the shutdown. Using as much physical distance as possible. (Photo Credit: James Redmond)
|
|
Shredding Work Day108 viewsSecond Shredding Work Day since Shutdown. Practicing physical distance as much as possible. (Photo Credit: James Redmond)
|
|
Shredding Work Day123 viewsSecond Shredding Work Day since shutdown. Practicing as much physical distancing as possible. (Photo Credit: James Redmond)
|
|
|
|
|