| Random files - Community Hours |

Shredding with COVID rules268 viewsThis was the second Shredding Work Day since the shutdown. Using as much physical distance as possible. (Photo Credit: James Redmond)
|
|

OVF Sign Reinstallation 5/14/2011663 viewsInstallation crew (Photo Credit: Ed Mosman 5/14/2011)
|
|

Shredding Work Day286 viewsSecond Shredding Work Day since Shutdown. Practicing physical distance as much as possible. (Photo Credit: James Redmond)
|
|

OVF Sign Reinstallation 5/14/2011647 viewsOVF sign with new reinforcements.
Concrete bases with steel brackets and 4x4 braces. 5/8" galvanized bolts were used throughout. (Photo Credit: D. Cleverdon taken 5/14/2011)
|
|

OVF Sign Reinstallation 5/14/2011610 viewsSteel brackets inbedded in concrete pedestals with 5/8" bolts were used to secure the bottoms of the posts. (Photo Credit: D. Cleverdon taken 5/14/2011)
|
|

Pulling wires664 viewsFrank and Ed begin feeding the wires for the electrical installation at OVF (Photo Credit: Frank Harris)
|
|

OVF Sign Reinstallation 5/14/2011655 viewsBraces are needed due to the ocean and desert winds. 4x4 braces were attached using 5/8" all-thread bolts. (Photo Credit: D. Cleverdon taken 5/14/2011)
|
|

Shredding Work Day282 viewsSecond Shredding Work Day since shutdown. Practicing as much physical distancing as possible. (Photo Credit: James Redmond)
|
|