OVF Photo Gallery


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favorites Search
Home > Community Hours

Workdays and Workgroups


2020-06-28_100836_42_shredding.jpg

10 files, last one added on Jun 28, 2020
Album viewed 144 times

Independent Projects



0 files
Album viewed 0 times

2 albums on 1 page(s)

Random files - Community Hours
2009-11-16_100280_74_img_3190__20091114_workday.jpg
OVF Workday509 viewsSigning in for a Saturday workday (Photo Credit: D. Cleverdon 11/14/2009 )
2011-05-24_100517_74_img_2089.jpg
OVF Sign Reinstallation 5/14/2011443 viewsThe other end of the brace was bolted to a steel post driven into the ground. (Photo Credit: D. Cleverdon taken 5/14/2011)
2009-11-16_100278_82_elec.jpg
Pulling wires479 viewsFrank and Ed begin feeding the wires for the electrical installation at OVF (Photo Credit: Frank Harris)
2020-06-28_100836_42_shredding.jpg
Shredding Work Day134 viewsSecond Shredding Work Day since shutdown. Practicing as much physical distancing as possible. (Photo Credit: James Redmond)
2011-05-24_100515_74_img_2088.jpg
OVF Sign Reinstallation 5/14/2011427 viewsSteel brackets inbedded in concrete pedestals with 5/8" bolts were used to secure the bottoms of the posts. (Photo Credit: D. Cleverdon taken 5/14/2011)
2011-05-24_100518_74_img_2087.jpg
OVF Sign Reinstallation 5/14/2011480 viewsInstallation crew (Photo Credit: Ed Mosman 5/14/2011)
2011-05-24_100516_74_img_2090.jpg
OVF Sign Reinstallation 5/14/2011460 viewsBraces are needed due to the ocean and desert winds. 4x4 braces were attached using 5/8" all-thread bolts. (Photo Credit: D. Cleverdon taken 5/14/2011)
2020-06-28_100835_42_shredding.jpg
Shredding Work Day117 viewsSecond Shredding Work Day since Shutdown. Practicing physical distance as much as possible. (Photo Credit: James Redmond)