| Top rated - Sustainability |

Compost Bays525 viewsThe compost area consists of 3 rows with 4 compost bays in each row.     (1 votes)
|
|

Compost Bays537 viewsEach row of bays has a Beginning Bay (far right-hand side), two Intermediate Bays and a Ready Bay (left-hand side of the picture).     (1 votes)
|
|

Spigot - Fralo Water Tank511 viewsThe spigot for the Fralo water tank is located just outside the shredder shed on the left-hand side.     (1 votes)
|
|

Spigot - City Water524 viewsCity water is used if water from the Fralo tank is unavailable.     (1 votes)
|
|

MacKissic Shredder510 viewsAfter the shredding is done the MacKissic is rolled back into the shed.     (1 votes)
|
|

Shredding Pile Finished521 viewsOnce all of the green waste has been shredded and watered the pile is complete.     (1 votes)
|
|

Building the Shred Pile545 viewsAs the pile of green waste builds up it gets watered. Watering the material helps accelerate the composting process.     (1 votes)
|
|

Water539 viewsWater is a valued resource at Ocean View Farms.     (1 votes)
|
|

Fralo Water Tank534 viewsWater runoff is collected from the roof of the nearby Little League equipment shed.     (1 votes)
|
|

Fralo Water Tank526 viewsFrom the Little League shed the runoff water is filtered into the tank. An underground water pipe runs from the tank to the lower composting area.     (1 votes)
|
|

Green Waste onto Sifting Screen550 viewsA long screen is used for sifting and sorting the garden waste.     (1 votes)
|
|

Sifting and Sorting the Green Waste537 viewsTrash and foreign objects (plastic, metal, glass, etc.) are sorted out of the green waste material. Dirt clods are broken up and dropped below the sifting screen as dirt will jam the shredder.     (1 votes)
|
|
|
|