OVF Photo Gallery


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favorites Search
Home > Sustainability > Rain Harvesting

Last additions - Rain Harvesting
2015-09-21_100717_74_1030img_7966.jpg
Rain Barrel Installation (June 2015)290 viewsDownspout directs water to the top of the first barrel. (Photo Credit: Dean Cleverdon (2015))Sep 21, 2015
2015-09-21_100716_74_1020img_7963.jpg
Rain Barrel Installation (June 2015)312 viewsGutters were installed on the roof of the tractor shed. (Photo Credit: Dean Cleverdon (2015))Sep 21, 2015
2015-09-21_100715_74_1010img_7974.jpg
Rain Barrel Installation (June 2015)296 viewsTwo 63-gal rain barrels made from from recycled plastic food grade containers were installed June 6, 2015 to collect water from the roof of the tractor shed. (Photo Credit: Dean Cleverdon (2015))Sep 21, 2015
2013-03-16_100632_74_05img_5683.jpg
Replumbing the Phase II Blue Cistern305 viewsTrench with new cistern water pipe filled in. Now it just needs to be leveled and the path mulched. (Photo Credit: D. Cleverdon 3/9/2013)Mar 16, 2013
2013-03-16_100631_74_04img_5669.jpg
Replumbing the Phase II Blue Cistern296 viewsThe new water pipe with a larger diameter installed in the trench (looking up Path 5). (Photo Credit: D. Cleverdon 3/9/2013)Mar 16, 2013
2013-03-16_100630_74_03img_5656.jpg
Replumbing the Phase II Blue Cistern297 viewsCrew almost finished digging the trench. New pipe will help increase gravity flow from cistern to the lower composting area. (Photo Credit: D. Cleverdon 3/9/2013)Mar 16, 2013
2013-03-16_100629_74_02img_5634.jpg
Replumbing the Phase II Blue Cistern313 viewsDigging a new trench for the cistern water pipe going down to the lower composting area. (Photo Credit: D. Cleverdon 3/9/2013)Mar 16, 2013
2013-03-16_100628_74_01img_5651.jpg
Replumbing the Phase II Blue Cistern338 viewsTipping the cistern up to remove the water prior to installing a new valve. (Photo Credit: D. Cleverdon 3/9/2013)Mar 16, 2013
2010-07-29_100408_82_cistern1.jpg
Blue Cistern (Gate 5 - Phase II)409 viewsThe Blue Water Cistern above Phase II (Gate 5) was our first cistern and was acquired in March 2008.Jul 29, 2010
IMG_2267_2008-03-12_WaterWorks_Dedication.JPG
Cistern Project Dedication461 viewsBlue Cistern Dedication March 12, 2008 (Photo Credit: Dean Cleverdon 3/12/2008)Oct 18, 2009
IMG_2280_2008-03-12_WaterWorks_Dedication.JPG
Cistern Project455 views (Photo Credit: Dean Cleverdon 3/12/2008)Oct 18, 2009
0352-Stable_waste_mixed_in-IMG_0102.JPG
Water for Composting489 viewsRain water is used by the OVF volunteer composting crew when building the compost piles using green waste material from the garden. (Photo Credit: Dean Cleverdon)Aug 26, 2009
24 files on 2 page(s) 2