Shredding Work Day263 viewsSecond Shredding Work Day since Shutdown. Practicing physical distance as much as possible. (Photo Credit: James Redmond)
|
|

OVF Sign Reinstallation 5/14/2011641 viewsInstallation crew (Photo Credit: Ed Mosman 5/14/2011)
|
|

OVF Sign Reinstallation 5/14/2011586 viewsSteel brackets inbedded in concrete pedestals with 5/8" bolts were used to secure the bottoms of the posts. (Photo Credit: D. Cleverdon taken 5/14/2011)
|
|

Shredding with COVID rules252 viewsThis was the second Shredding Work Day since the shutdown. Using as much physical distance as possible. (Photo Credit: James Redmond)
|
|

Pulling wires642 viewsFrank and Ed begin feeding the wires for the electrical installation at OVF (Photo Credit: Frank Harris)
|
|

OVF Sign Reinstallation 5/14/2011607 viewsThe other end of the brace was bolted to a steel post driven into the ground. (Photo Credit: D. Cleverdon taken 5/14/2011)
|
|

OVF Sign Reinstallation 5/14/2011629 viewsBraces are needed due to the ocean and desert winds. 4x4 braces were attached using 5/8" all-thread bolts. (Photo Credit: D. Cleverdon taken 5/14/2011)
|
|

OVF Workday686 viewsSigning in for a Saturday workday (Photo Credit: D. Cleverdon 11/14/2009 )
|
|