| Top rated |

Compost Bays556 viewsEach row of bays has a Beginning Bay (far right-hand side), two Intermediate Bays and a Ready Bay (left-hand side of the picture).     (1 votes)
|
|

Spigot - Fralo Water Tank531 viewsThe spigot for the Fralo water tank is located just outside the shredder shed on the left-hand side.     (1 votes)
|
|

Spigot - City Water549 viewsCity water is used if water from the Fralo tank is unavailable.     (1 votes)
|
|

MacKissic Shredder529 viewsAfter the shredding is done the MacKissic is rolled back into the shed.     (1 votes)
|
|

Shredding Pile Finished546 viewsOnce all of the green waste has been shredded and watered the pile is complete.     (1 votes)
|
|

Building the Shred Pile569 viewsAs the pile of green waste builds up it gets watered. Watering the material helps accelerate the composting process.     (1 votes)
|
|

Water560 viewsWater is a valued resource at Ocean View Farms.     (1 votes)
|
|

Fralo Water Tank555 viewsWater runoff is collected from the roof of the nearby Little League equipment shed.     (1 votes)
|
|

Fralo Water Tank546 viewsFrom the Little League shed the runoff water is filtered into the tank. An underground water pipe runs from the tank to the lower composting area.     (1 votes)
|
|

Green Waste onto Sifting Screen571 viewsA long screen is used for sifting and sorting the garden waste.     (1 votes)
|
|

Sifting and Sorting the Green Waste560 viewsTrash and foreign objects (plastic, metal, glass, etc.) are sorted out of the green waste material. Dirt clods are broken up and dropped below the sifting screen as dirt will jam the shredder.     (1 votes)
|
|

Shredding the Material538 viewsSorted material being fed into the shredder.     (1 votes)
|
|
| 422 files on 36 page(s) |
 |
 |
 |
 |
 |
28 |  |
 |
 |
 |
|