| Most viewed |

Compost Ready for Use513 viewsThe compost is available when the wall of the Ready bay has been removed.
|
|

Front Gate512 views
|
|

Stable Waste511 viewsStable waste is moved to the edge of the composting bay.
|
|

Grandview Project (2006)510 views (Photo Credit: Dean Cleverdon 10/14/2006)
|
|

509 views
|
|

MacKissic Shredder509 viewsAfter the shredding is done the MacKissic is rolled back into the shed.
|
|

Raven or Crow509 views (Photo Credit: D. Cleverdon 10/17/2009)
|
|

Pot Luck Luncheon508 viewsSetting up for the pot luck luncheon
|
|

Shredding the Material508 viewsSorted material being fed into the shredder.
|
|

Spigot - Fralo Water Tank507 viewsThe spigot for the Fralo water tank is located just outside the shredder shed on the left-hand side.
|
|

Shredded Green Waste507 viewsShredded green waste is moved to the composting bays where it gets another dose of water.
|
|

Stable Waste507 viewsRaw stable waste is brought down from the upper bins and piled near composting bays for the convenience of the crew.
|
|
| 630 files on 53 page(s) |
 |
 |
 |
 |
 |
11 |  |
 |
 |
 |
|