OVF Photo Gallery


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favorites Search
Most viewed
0170-Shredder_Shed-IMG_9471.JPG
MacKissic Shredder585 viewsThe MacKissic Shredder is kept in the shredder shed with other composting tools.
0211-Shredding_green_waste-IMG_0437.jpg
Shredding the Material585 viewsAnother view of the green waste being fed into the shredder. The shredded material is blown out below onto a concrete pad where it is formed into a pile.
010-Chipper_Shed_IMG_0780_Chipper.JPG
Vermeer Wood Chipper584 viewsThe chipper in its storage shed.
0101-Green_Waste-IMG_9718.JPG
Leafy Green Waste584 viewsLeafy green waste goes on the right-hand side near the shredder shed.
0301-Lower_compost_pits-IMG_9480.JPG
Compost Bays583 viewsThe compost area consists of 3 rows with 4 compost bays in each row.
0242-Water_Tank-IMG_2279.JPG
Fralo Water Tank582 viewsFrom the Little League shed the runoff water is filtered into the tank. An underground water pipe runs from the tank to the lower composting area.
0400-Compost_not_ready_sign-IMG_9455.JPG
Compost "Not Ready" Sign580 viewsThis sign means none of the Ready compost bays is open.
070-Mulch_IMG_2233_chipper.JPG
Mulch580 viewsChipped wood is excellent for mulching trees, garden paths and more.
0391-Flipping_compost_pile-IMG_0647_.jpg
Turning the Material579 viewsIt takes three turns over several months before the material is finally ready. Hard work but very satisfying when finished.
2010-09-11_100463_82_999.jpg
Another successful Tomatobration!577 views (Photo Credit: Ona Rynearson 8/8/2010)
0270-Finished_shredded_pile-IMG_0503IMG_0503.jpg
Shredding Pile Finished576 viewsOnce all of the green waste has been shredded and watered the pile is complete.
0300-Composting_Sign-IMG_9456.JPG
Composting Crew - Saturdays - 9:00 a.m.575 viewsVolunteers meet every Saturday morning at 9:00 a.m. in the lower composting area to build compost. All garden members are welcome to participate. Sturdy shoes and gloves are recommended.
631 files on 53 page(s) 10