Most viewed |
Turning the Material412 viewsIt takes three turns over several months before the material is finally ready. Hard work but very satisfying when finished.
|
|
Compost "Not Ready" Sign412 viewsThis sign means none of the Ready compost bays is open.
|
|
Compost Bays411 viewsThe compost area consists of 3 rows with 4 compost bays in each row.
|
|
Composting Crew - Saturdays - 9:00 a.m.411 viewsVolunteers meet every Saturday morning at 9:00 a.m. in the lower composting area to build compost. All garden members are welcome to participate. Sturdy shoes and gloves are recommended.
|
|
MacKissic Shredder410 viewsMoving the shredder into position on the concrete pad below the sifting screen.
|
|
Covering the Shredded Pile409 viewsThe pile is completely covered to keep the moisture in until the Composting Crew builds it into the compost bays on Saturday morning. Until then the material will heat up and begin to decompose.
|
|
Shredding Pile Finished409 viewsOnce all of the green waste has been shredded and watered the pile is complete.
|
|
Mulch409 viewsChipped wood is excellent for mulching trees, garden paths and more.
|
|
Outstanding in the Field - Looking Up409 views140 diners attended the OITF event at OVF on 6/23/2010 (Photo Credit: Frank Harris)
|
|
408 views
|
|
Pot Luck Luncheon407 viewsSetting up for the pot luck luncheon
|
|
Pumpkin407 views (Photo Credit: Dean Cleverdon 8/30/2009)
|
|
630 files on 53 page(s) |
|
|
|
|
|
10 | |
|
|
|
|