IMG_2280_2008-03-12_WaterWorks_Dedication.JPG
Cistern Project (Photo Credit: Dean Cleverdon 3/12/2008)
IMG_2267_2008-03-12_WaterWorks_Dedication.JPG
Cistern Project DedicationBlue Cistern Dedication March 12, 2008 (Photo Credit: Dean Cleverdon 3/12/2008)
2016-07-16_74_070010-img_8825.jpg
Lower Composting CisternsTwo 305 gallon water cisterns installed on the east side of the Lower Composting sheds on February 27, 2016. Fence in front of the cisterns protects the pipes and shut-off valves from damage. (Photo Credit: D. Cleverdon)
2016-07-10_74_070120-img_8693.jpg
Hose Bib - Lower CompostingWater collected from the Blue Cistern and Main Shed Cisterns in the upper garden are directed to this one point: the Lower Composting Hose Bib. A pump in the Chipper Shed increases water flow. (Photo Credit: D. Cleverdon)
2016-04-05_74_050010-img_4695.jpg
Main Shed CisternsTwo large water cisterns were installed by the NE corner of the Main Shed on 2/27/2016. Each tank holds 1000 gallons of water which is piped down to cisterns in the Lower Composting area. (Photo Credit: D. Cleverdon)
2016-03-30_74_030010-img_4706.jpg
Blue Cistern for Rain HarvestingIt collects water from the roof of the North Venice Little League storage shed. The working capacity is 1060 gallons of water which is is currently diverted to the Lower Composting Cisterns. (Photo Credit: D. Cleverdon)
2013-03-16_100632_74_05img_5683.jpg
Replumbing the Phase II Blue CisternTrench with new cistern water pipe filled in. Now it just needs to be leveled and the path mulched. (Photo Credit: D. Cleverdon 3/9/2013)
2013-03-16_100632_74_05img_5683.jpg
Replumbing the Phase II Blue CisternTrench with new cistern water pipe filled in. Now it just needs to be leveled and the path mulched. (Photo Credit: D. Cleverdon 3/9/2013)
2013-03-16_100631_74_04img_5669.jpg
Replumbing the Phase II Blue CisternThe new water pipe with a larger diameter installed in the trench (looking up Path 5). (Photo Credit: D. Cleverdon 3/9/2013)
2013-03-16_100631_74_04img_5669.jpg
Replumbing the Phase II Blue CisternThe new water pipe with a larger diameter installed in the trench (looking up Path 5). (Photo Credit: D. Cleverdon 3/9/2013)
2013-03-16_100630_74_03img_5656.jpg
Replumbing the Phase II Blue CisternCrew almost finished digging the trench. New pipe will help increase gravity flow from cistern to the lower composting area. (Photo Credit: D. Cleverdon 3/9/2013)
2013-03-16_100630_74_03img_5656.jpg
Replumbing the Phase II Blue CisternCrew almost finished digging the trench. New pipe will help increase gravity flow from cistern to the lower composting area. (Photo Credit: D. Cleverdon 3/9/2013)