Login
Album list :: Search -->
Search results - "blue"
IMG_2267_2008-03-12_WaterWorks_Dedication.JPG
Cistern Project DedicationBlue Cistern Dedication March 12, 2008 (Photo Credit: Dean Cleverdon 3/12/2008)
2016-07-10_74_070120-img_8693.jpg
Hose Bib - Lower CompostingWater collected from the Blue Cistern and Main Shed Cisterns in the upper garden are directed to this one point: the Lower Composting Hose Bib. A pump in the Chipper Shed increases water flow. (Photo Credit: D. Cleverdon)
2016-03-30_74_030010-img_4706.jpg
Blue Cistern for Rain HarvestingIt collects water from the roof of the North Venice Little League storage shed. The working capacity is 1060 gallons of water which is is currently diverted to the Lower Composting Cisterns. (Photo Credit: D. Cleverdon)
2014-12-16_100697_51002_blue_hibiscus.jpg
Hibiscus - Blue SatinBlue Satin hibiscus - closest to true blue of all the "Rose of Sharon" varieties (Photo Credit: Derbeh Vance - C32)
2013-06-14_100641_51002_iris_6.jpg
Pacific Iris - Deep Blue SeaIris douglasiana - Pacific Coast Iris - "Deep Blue Sea" (Photo Credit: derbeh vance)
2013-06-14_100640_51002_iris_7.jpg
Pacific Iris - Deep Blue SeaIris douglasiana - Pacific Coast Iris - "Deep Blue Sea" (Photo Credit: derbeh vance)
2013-03-16_100632_74_05img_5683.jpg
Replumbing the Phase II Blue CisternTrench with new cistern water pipe filled in. Now it just needs to be leveled and the path mulched. (Photo Credit: D. Cleverdon 3/9/2013)
2013-03-16_100632_74_05img_5683.jpg
Replumbing the Phase II Blue CisternTrench with new cistern water pipe filled in. Now it just needs to be leveled and the path mulched. (Photo Credit: D. Cleverdon 3/9/2013)
2013-03-16_100631_74_04img_5669.jpg
Replumbing the Phase II Blue CisternThe new water pipe with a larger diameter installed in the trench (looking up Path 5). (Photo Credit: D. Cleverdon 3/9/2013)
2013-03-16_100631_74_04img_5669.jpg
Replumbing the Phase II Blue CisternThe new water pipe with a larger diameter installed in the trench (looking up Path 5). (Photo Credit: D. Cleverdon 3/9/2013)
2013-03-16_100630_74_03img_5656.jpg
Replumbing the Phase II Blue CisternCrew almost finished digging the trench. New pipe will help increase gravity flow from cistern to the lower composting area. (Photo Credit: D. Cleverdon 3/9/2013)
2013-03-16_100630_74_03img_5656.jpg
Replumbing the Phase II Blue CisternCrew almost finished digging the trench. New pipe will help increase gravity flow from cistern to the lower composting area. (Photo Credit: D. Cleverdon 3/9/2013)
17 files on 2 page(s) 1